Final | 1/16/2009 | 1/20/2009 | 1/20/2009 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/16/2009 at 1:37:29 PM. Contact: ###-####. FINAL FOR PHASE #1 note some work was inspected on ele-08-02563 by mistake, but everything has been inspected. Phase #! was on both 2nd and 3rd floors ok card signed
|
Final | 11/25/2008 | 11/26/2008 | 11/26/2008 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/25/2008 at 10:43:55 AM. Contact: ###-####. ok to final part anop, no esc this project
|
Final | 11/7/2008 | 11/10/2008 | 11/10/2008 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/7/2008 at 11:30:38 AM. Contact: ###-####. 2nd floor anop ok to occupy, no esc this project
|
Electrical Rough-In | 10/23/2008 | 10/23/2008 | 10/23/2008 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/23/2008 at 7:40:14 AM. Contact: ###-####. ok to cover ceilings anop, no esc this project
|
Electrical Rough-In | 10/9/2008 | 10/9/2008 | 10/9/2008 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/9/2008 at 7:39:02 AM. Contact: ###-####. ok to cover walls only 2nd floor anop, no esc this project
|
Electrical Rough-In | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/30/2008 at 12:46:21 PM. Contact: ###-####. 3rd floor anop
|
Electrical Rough-In | 9/24/2008 | 9/24/2008 | 9/24/2008 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/24/2008 at 7:04:56 AM. Contact: ###-####. walls ok 3rd floor numbers 312, and 313
|