Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE08-02572
StatusFinaled
Name PEAK ELECTRIC
Site Address 802 W IDAHO ST
Project Name802 W IDAHO ST
Customer Number 
ePlanReview 
Description
Electrical Permit - Alteration: Labor for Lighting Installation, Gear as specified, Conduit & Back boxes for Fire Alarm, Temp Power
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/4/200811/5/200811/5/2008APASS
DetailsBob Reichert
Electrical final inspection. james is onsite 9193656 Phone #: ###-#### Internet Inspection Request from: Beka Hereau ok to final, signed occupancy card
Electrical Rough-In10/29/200810/29/200810/29/2008PPASS
DetailsBob Reichert
2nd Floor Hard Lid Inspection. James is onsite Journeyman ###-#### Phone #: ###-#### Internet Inspection Request from: Beka Hereau 2nd floor hard lids ok to cover anop, no esc this project
Electrical Rough-In10/21/200810/22/200810/22/2008APART
DetailsBob Reichert
Hard lid cieling inspection.
Please call James on-site with any questions. Phone #: ###-#### Internet Inspection Request from: Beka Hereau ok to cover hard lid anop, no esc this project
Electrical Rough-In10/2/200810/3/200810/3/2008APASS
DetailsMike Kinnear
1st floor cieling inspection, 2nd floor shoe wall inspection. James on-site J-card ###-####
Phone #: ###-#### Internet Inspection Request from: Beka Hereau ok cover walls & ceilings anop front entrey & one wall north side 2nd floor note no esc permit in project
Electrical Rough-In9/30/200810/1/200810/1/2008APASS
DetailsMike Kinnear
2nd Floor Wall Inspection. Electrical, James on-site ###-#### Phone #: ###-#### Internet Inspection Request from: Beka Hereau ok cover walls only anop note no esc permit in project
Electrical Rough-In9/29/20089/29/20089/29/2008PPASS
DetailsBob Reichert
Downstairs Cove Wall Electrical Inspection- James on-site ###-#### Phone #: ###-#### Internet Inspection Request from: Beka Hereau cove walls anop only ok to cover, no esc this project
Electrical Rough-In9/24/20089/26/20089/26/2008APASS
DetailsPat Lass
1st Floor Wall Inspection. James is on site j-card ###-#### Phone #: ###-#### Internet Inspection Request from: Beka Hereau
walls ANOP