Final | 11/13/2008 | 11/14/2008 | 11/14/2008 | A | PASS |
Bob Reichert
|
|
|
Jared- for apt 755 & 757- call for access Phone #: ###-#### ok to final, no esc this project
|
Permanent Service | 10/21/2008 | 10/22/2008 | 10/22/2008 | A | PASS |
Bob Reichert
|
|
|
jared Phone #: ###-#### called contractor, p/s o/h rec ok- 4 meters (on site), no esc this project
|
Electrical Rough-In | 9/22/2008 | 9/23/2008 | 9/23/2008 | A | PASS |
Bob Reichert
|
|
|
jared - please call 1/2 hr prior Phone #: ###-#### corrections made, ok to cover 755 and 757 only, look at power later, no esc this project
|
Conference | 9/22/2008 | 9/22/2008 | 9/22/2008 | P | DONE |
Jack Frank
|
|
|
jerod Note: please call 1/2 hr prior to inspection Phone #: ###-#### - units 755 & correct box fill outlet spacing remove range hood from SABC, connectors for all boxes
|
Electrical Rough-In | 9/22/2008 | 9/22/2008 | 9/22/2008 | P | FAIL |
Jack Frank
|
|
|
jerod Note: please call 1/2 hr prior to inspection Phone #: ###-#### corr for service shall grd and bond u/g pipe, hot and cold, jumpers around isolated metal pipe,, calc service
|