Final | 4/9/2010 | 4/12/2010 | 4/12/2010 | A | PASS |
Doug A Poedy
|
|
|
dave Phone #: ###-####
|
DOC - Permit Finaled | 4/12/2010 | 4/12/2010 | 4/12/2010 | P | PASS |
Doug A Poedy
|
|
|
|
Final | 3/30/2010 | 3/31/2010 | 3/31/2010 | A | CANC |
Doug A Poedy
|
|
|
david Phone #: ###-####- per Phone call from David Biggar 9:15am
|
Final | 3/29/2010 | 3/30/2010 | 3/30/2010 | A | FAIL |
Doug A Poedy
|
|
|
David Phone #: ###-####. Needs to change out undercabinet wiremold boxes, to boxes that will allow bushings.
|
Electrical Rough-In | 10/26/2009 | 10/26/2009 | 10/26/2009 | P | PASS |
Doug A Poedy
|
|
|
David Phone #: ###-####
|
Conference | 9/22/2008 | 9/24/2008 | 9/24/2008 | A | DONE |
Jack Frank
|
|
|
David Phone #: ###-#### went over NEC requirements for subpanel , kit. and din rm
|