Final | 1/14/2009 | 1/15/2009 | 1/15/2009 | A | PASS |
Jack Frank
|
|
|
Re-inspection final Phone #: ###-#### Internet Inspection Request from: David Nelson ok card signed
|
Final | 1/5/2009 | 1/6/2009 | 1/6/2009 | A | NR |
Bob Reichert
|
|
|
The tellers at the front door will let you into the back area Phone #: ###-#### Internet Inspection Request from: David Nelson called contractor, told that panel must be closed, panel schedule complete, receptacles work, and be tight in wall, ceiling to be opened for inspection of seismic wires etc, fee due
|
ELE-Aging Inspection | 12/16/2008 | 12/16/2008 | 12/16/2008 | | PART |
Jack Frank
|
|
|
called contr said job is on hold
|
Electrical Rough-In | 10/13/2008 | 10/13/2008 | 10/13/2008 | P | PART |
Jack Frank
|
|
|
rough inspection to cover new walls in Post office remodel(now attached to building permit) Phone #: ###-#### Internet Inspection Request from: David Nelson walls ok
|
Electrical Rough-In | 10/10/2008 | 10/10/2008 | 10/10/2008 | P | CANC |
Jack Frank
|
|
|
rough inspection to cover new walls in Post office remodel Phone #: ###-#### Internet Inspection Request from: David Nelson called no answer and contr phone mail box full could not leave message. contr needs to have his electrical permit attached to BLD permit
|