Final | 1/21/2010 | 1/21/2010 | 1/21/2010 | P | PASS |
Bob Reichert
|
|
|
Chris Phone #: ###-#### corrections made, ok to final
|
Final | 1/19/2010 | 1/19/2010 | 1/19/2010 | P | FAIL |
Doug A Poedy
|
|
|
chris Phone #: ###-####. 210.8 GFCI Kitchen
|
Final | 1/12/2010 | 1/12/2010 | 1/12/2010 | P | PART |
Bob Reichert
|
|
|
Christopher Phone #: ###-#### met helper, not really ready, needs to add recpt at bottom of stairs, put on panel covers, label panels, bond hot and cold water pipes, run nm cable in flex at hot water heater, add blank cover in ceiling, check open n for kitchen gfci, add receptale upper room with arched doors, add recpt cover, add bushings to low volt media cables, add recpt cover in media panel, do rooftop receptacles with in-use covers, ground metal boxes, check rest of rooftop
|
Electrical Rough-In | 11/19/2009 | 11/19/2009 | 11/19/2009 | P | CANC |
Doug A Poedy
|
|
|
Christopher Phone #: ###-####. Partial final so that they could install appliances.
|
Final | 11/19/2009 | 11/19/2009 | 11/19/2009 | P | PART |
Doug A Poedy
|
|
|
Christopher Phone #: ###-####. Checked both laundry(stacked units) receptacles, behind zero air refrigerator receptacle, and notified to hard wire double oven.
|
Permanent Service | 4/14/2009 | 4/15/2009 | 4/14/2009 | A | PASS |
Pat Lass
|
|
|
christopher - please call for access Phone #: ###-#### P/S U/G N Ok
|
Permanent Service | 4/8/2009 | 4/9/2009 | 4/9/2009 | A | NR |
Jack Frank
|
|
|
Phone #: ###-#### called needs #4 copper for GEC from each panel to electrode, needs to install u/g conduit into meterbase
|
Electrical Rough-In | 3/24/2009 | 3/25/2009 | 3/24/2009 | A | PASS |
Pat Lass
|
|
|
nels Phone #: ###-#### R/I ok check for required receps on final because approved plan not followed and incomplete
|
Electrical Rough-In | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | FAIL |
Pat Lass
|
|
|
Nelson Phone #: ###-#### derate wires more than 9 through a hole. 210.52
|
Electrical Rough-In | 3/19/2009 | 3/20/2009 | 3/20/2009 | P | FAIL |
Pat Lass
|
|
|
nelson Phone #: ###-#### replace boxes that have extra knock-outs missing. box overfilled. wiring in cold air return. no more than 9 current carying conductors through a hole. will have to insure that all required receps are installed on final because plan is unclear.
|
Conference | 3/16/2009 | 3/17/2009 | 3/17/2009 | A | PART |
Pat Lass
|
|
|
Chris- After 10 please- call 30 mins prior to going Phone #: ###-#### talked about general requirements.
|
Electrical Rough-In | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | FAIL |
Jack Frank
|
|
|
brian Phone #: ###-#### do not cover posted owner needs to be present at time of inspection, needs conference, borken boxes, box fill outlet spacing walls and counters grding at p/s wrong, plans do not match job, have no idea if he has required circuits for kit, bath, and so on, phone number in notes was for framer,
|