Final | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | PASS |
Doug A Poedy
|
|
|
alan Phone #: ###-####. Ok final.
|
ELE-Aging Inspection | 6/8/2009 | 6/8/2009 | 6/9/2009 | | DONE |
Bob Reichert
|
|
|
no activity, suc
|
Permanent Service | 4/3/2009 | 4/3/2009 | 4/3/2009 | P | PASS |
Pat Lass
|
|
|
alan Phone #: ###-#### p/s u/g n oK
|
Permanent Service | 4/2/2009 | 4/2/2009 | 4/2/2009 | P | PART |
Pat Lass
|
|
|
Alan Phone #: ###-#### 2 large transformers ok ground neutral in generator and isolate neut in small transformer disconnect
|
Permanent Service | 3/30/2009 | 3/31/2009 | 3/31/2009 | A | PART |
Pat Lass
|
|
|
alan Phone #: ###-#### had conf about grounding and bonding
|
Electrical Rough-In | 1/27/2009 | 1/28/2009 | 1/28/2009 | A | PART |
Jack Frank
|
|
|
allen Note: ceiling Phone #: ###-#### gen. rm hard ceiling and GEC splice in wall ok
|
Electrical Rough-In | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PART |
Pat Lass
|
|
|
allen Phone #: ###-#### U/G Ok
|
Electrical Rough-In | 11/20/2008 | 11/21/2008 | 11/21/2008 | P | PART |
Pat Lass
|
|
|
allen Phone #: ###-#### outside u/g ok
|
Electrical Rough-In | 11/5/2008 | 11/6/2008 | 11/7/2008 | A | PART |
Pat Lass
|
|
|
alan - groundwork Phone #: ###-#### electrode ok
|
Electrical Rough-In | 10/22/2008 | 10/22/2008 | 10/22/2008 | P | PASS |
Bob Reichert
|
|
|
alan - underground Phone #: ###-#### met electrician, told that service will need to be grouped or possibly abandon old service as the project gets built, u/g ok to cover east side of building from new transformer spot to entry into existing building
|