Final | 3/16/2009 | 3/17/2009 | 3/17/2009 | P | PASS |
Pat Lass
|
|
|
Joyce- home after 3 Phone #: ###-####
|
Conference | 3/9/2009 | 3/10/2009 | 3/10/2009 | A | PART |
Pat Lass
|
|
|
Joyce- call 30 mins prior to going for access Phone #: ###-#### talked about requirements for final
|
Conference | 2/17/2009 | 2/20/2009 | 2/20/2009 | A | DONE |
Bob Reichert
|
|
|
joyce - please call 1/2 hr prior Phone #: ###-#### looked at job to review what needs to be done for final inspection, owner has issue with date of permit and using tamper resistant receptacles. Told owner that all covers and devices shall be installed for final, also he shall not run open nm cable for water heat system. Also told that boxes shall be flush with finished surface in basement because of thickness of panelling. No esc this project
|
Final | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | NR |
Pat Lass
|
|
|
joyce Note: please call 1/2 hr prior to inspection Phone #: ###-#### this was for a R/I
|
Electrical Rough-In | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | PASS |
Pat Lass
|
|
|
joyce Note: please call 1/2 hr prior to inspection Phone #: ###-#### R/I Ok
|
Electrical Rough-In | 11/24/2008 | 11/25/2008 | 11/25/2008 | P | PART |
Pat Lass
|
|
|
joyce - please call 1/2 hr prior Phone #: ###-#### upstairs ok
|
Electrical Rough-In | 11/14/2008 | 11/14/2008 | 11/14/2008 | P | PART |
Pat Lass
|
|
|
JOYCE Phone #: ###-#### talked about general requirements
|