Final | 10/28/2008 | 10/29/2008 | 10/29/2008 | A | PASS |
Bob Reichert
|
|
|
ryan Phone #: ###-#### ok to final, signed structural card, no esc this project
|
Electrical Rough-In | 10/21/2008 | 10/22/2008 | 10/22/2008 | A | PASS |
Bob Reichert
|
|
|
Rough-in Inspection of 2nd Floor - Ryan Phone #: ###-#### Internet Inspection Request from: Kevin Perez ric ok, wall only, no esc this project
|