Rough-In Permanent Service | 11/20/2008 | 11/21/2008 | 11/21/2008 | A | PASS |
Pat Lass
|
|
|
ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten P/S O/H R Ok
|
DOC - Permit Finaled | 11/21/2008 | 11/21/2008 | 11/21/2008 | P | PASS |
Pat Lass
|
|
|
|
Rough-In Permanent Service | 11/17/2008 | 11/17/2008 | 11/17/2008 | P | FAIL |
Pat Lass
|
|
|
ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten bond service raceway seal top of panel secure dead front and properly install main bonding jumper and the neutral conductor that is presently under it.
|
Rough-In Permanent Service | 11/6/2008 | 11/6/2008 | 11/6/2008 | A | CANC |
Pat Lass
|
|
|
ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten Inspection cancelled from web by: gary batten
|
Permanent Service | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | FAIL |
Pat Lass
|
|
|
wooden pole is ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten meter sealed no grounding electrodes and service conductors run thriough the disconnect. bonding not done
|