Final | 2/11/2009 | 2/13/2009 | 2/13/2009 | A | PASS |
Pat Lass
|
|
|
Mike- open after 8:30 Phone #: ###-####
|
Electrical Rough-In | 12/15/2008 | 12/15/2008 | 12/15/2008 | P | PASS |
Pat Lass
|
|
|
eric- floor heat Phone #: ###-#### floor heat ok
|
Permanent Service | 11/20/2008 | 11/20/2008 | 11/20/2008 | A | PASS |
Pat Lass
|
|
|
Mike ###-#### P/S O/H R Ok
|
Electrical Rough-In | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PASS |
Pat Lass
|
|
|
mike cole Phone #: ###-####
|
Conference | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | PART |
Pat Lass
|
|
|
MIKE COLE Phone #: ###-#### talked about service
|
Electrical Rough-In | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | NR |
Pat Lass
|
|
|
mike cole Phone #: ###-####
|