Final | 2/5/2009 | 2/5/2009 | 2/5/2009 | P | PASS |
Mike Kinnear
|
|
|
ron Note: please call 1/2 hr prior to inspection Phone #: ###-#### ok final kitchen only note no esc permit in project
|
Electrical Rough-In | 11/12/2008 | 11/13/2008 | 11/13/2008 | P | PASS |
Jack Frank
|
|
|
terry Note: please call 1/2 hr prior to inspection Phone #: ###-#### kit. r/i ok
|
Electrical Rough-In | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | CANC |
Jack Frank
|
|
|
don Phone #: ###-####2 - please call 1/2 hr prior contr called and canceled
|