Final | 1/5/2009 | 1/5/2009 | 1/5/2009 | P | PASS |
Pat Lass
|
|
|
Steve Phone #: ###-####
|
Electrical Rough-In | 12/16/2008 | 12/17/2008 | 12/17/2008 | A | PASS |
Bob Reichert
|
|
|
steve Phone #: ###-#### ok to cover server room ceiling only, no esc this project
|
Electrical Rough-In | 12/12/2008 | 12/15/2008 | 12/15/2008 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/12/2008 at 9:44:53 AM. Contact: ###-####. ceiling except for server room ok
|
Electrical Rough-In | 11/24/2008 | 11/24/2008 | 11/24/2008 | P | PART |
Pat Lass
|
|
|
steve Phone #: ###-#### walls and hard lid ok
|
Electrical Rough-In | 11/13/2008 | 11/14/2008 | 11/14/2008 | A | PART |
Pat Lass
|
|
|
Steve Phone #: ###-#### walls except conf room ok no esc in project
|