Final | 1/30/2009 | 1/30/2009 | 1/30/2009 | A | PASS |
Jack Frank
|
|
|
meter for p/s ok
|
ELE-Aging Inspection | 1/26/2009 | 1/26/2009 | 1/26/2009 | | PART |
Jack Frank
|
|
|
wsuc
|
Rough-In Permanent Service | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | PASS |
Jim Schmer
|
|
|
pat Phone #: ###-#### ground installed between subpanels p/s meter only ok JMS
|
Permanent Service | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | DONE |
Jack Frank
|
|
|
pat Phone #: ###-####
|
Permanent Service | 11/25/2008 | 11/25/2008 | 11/25/2008 | P | CANC |
Mike Kinnear
|
|
|
pat Phone #: ###-#### wrong type inspection
|
Conference | 11/25/2008 | 11/25/2008 | 11/25/2008 | P | DONE |
Mike Kinnear
|
|
|
pat Phone #: ###-#### both service sub panels needs equipment grounding conductor because nipple between main panel & sub panels are plastic. pat will fix & recall for inspection tomorrow
|