Final | 1/7/2009 | 1/8/2009 | 1/8/2009 | A | PASS |
Bob Reichert
|
|
|
Pat wanted to come inspect furniture. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean ok to final, survey panel schedules and multipole breakers, signed occupancy card, no esc this project
|
Final | 1/5/2009 | 1/6/2009 | 1/6/2009 | A | PART |
Pat Lass
|
|
|
Please provide final inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean signed T/o furnishings shall be wired by contractor and floor box requires cover.
|
Electrical Rough-In | 12/19/2008 | 12/22/2008 | 12/22/2008 | P | PASS |
Jack Frank
|
|
|
Please provide ceiling inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean ok
|
Electrical Rough-In | 12/1/2008 | 12/2/2008 | 12/2/2008 | A | PART |
Pat Lass
|
|
|
Please provide wall cover inspection. Contact Travis. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean wall R/I Ok
|