Final | 6/4/2009 | 6/4/2009 | 6/4/2009 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/4/2009 at 9:26:47 AM. Contact: ###-####. house looked at earlier, u/g ok to cover, looked at garage, ok to final
|
Final | 2/27/2009 | 2/27/2009 | 2/27/2009 | P | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 2/27/2009 at 11:10:04 AM. Contact: ###-####. told contractor that it was not city policy to give partial finals on residential and the garage has to be finished.
|
Permanent Service | 1/5/2009 | 1/5/2009 | 1/5/2009 | P | PASS |
Pat Lass
|
|
|
tom Phone #: ###-#### P/S O/H N Ok
|
Electrical Rough-In | 12/22/2008 | 12/22/2008 | 12/22/2008 | P | FAIL |
Bob Reichert
|
|
|
Tom- Please call for inspection details Phone #: ###-#### talked to contractor, excavator didn't open trench far enough, told to open at least 4' at each end, garage light box taken down by framers, told electrician to check before call for ri
|
Electrical Rough-In | 12/9/2008 | 12/9/2008 | 12/9/2008 | P | PART |
Pat Lass
|
|
|
Tom Phone #: ###-#### House R/I Ok layout doesnt match approved plan. garage nail plates and expose underground. install disconnect for outside feeder to house.
|