Final | 2/12/2009 | 2/12/2009 | 2/12/2009 | A | PASS |
Bob Reichert
|
|
|
non fuesable disconnect is installed as per request. Phone #: ###-#### Internet Inspection Request from: Miles Elletson corrections made, ok to final, no esc this project
|
Permanent Service | 2/12/2009 | 2/12/2009 | 2/12/2009 | A | PASS |
Bob Reichert
|
|
|
non fuesable disconnect is installed as per request. Phone #: ###-#### Internet Inspection Request from: Miles Elletson p/s u/g n ok, no esc this project
|
Final | 12/22/2008 | 12/22/2008 | 12/22/2008 | P | FAIL |
Jack Frank
|
|
|
sign light has been eliminated, final inspection for stc at front entrance Phone #: ###-#### Internet Inspection Request from: Miles Elletson shall provide electrode at time clock service by front entry it is a feeder, if non fused disconnect use its ok then it is abranch circuit called call for p/s not final
|
Rough-In Permanent Service | 12/9/2008 | 12/9/2008 | 12/9/2008 | P | CANC |
Mike Kinnear
|
|
|
trench inspection Phone #: ###-#### Internet Inspection Request from: Miles Elletson wrong type inspection
|
Electrical Rough-In | 12/9/2008 | 12/9/2008 | 12/9/2008 | P | PASS |
Mike Kinnear
|
|
|
trench inspection Phone #: ###-#### Internet Inspection Request from: Miles Elletson ok cover under ground conduit only 2 areas front & back of subdivision
|