Final | 2/11/2009 | 2/12/2009 | 2/12/2009 | A | PASS |
Jack Frank
|
|
|
jeremy Phone #: ###-#### ok
|
Final | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | FAIL |
Jack Frank
|
|
|
jeremy Phone #: ###-#### corr fee due called 210.8 gfci for wet bar and bathrm , 408.4 panel schedule all messed up
|
Electrical Rough-In | 12/15/2008 | 12/15/2008 | 12/15/2008 | P | PASS |
Jack Frank
|
|
|
jeremy Phone #: ###-#### ok correction made range circuit removed
|
Electrical Rough-In | 12/11/2008 | 12/12/2008 | 12/12/2008 | A | FAIL |
Jack Frank
|
|
|
jeremy Phone #: ###-#### wiring not done to plans on site house wired for 2 kitchens call plan check house con only have 1 kitchen contr will remove range circuit
|