Final | 4/24/2009 | 4/27/2009 | 4/27/2009 | A | PASS |
Pat Lass
|
|
|
Need to schedule in order to have pump house unlocked Pat Lass and I had discussed 8:15am as a meeting time if that changes please call Mike at ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
|
Final | 4/16/2009 | 4/20/2009 | 4/20/2009 | A | FAIL |
Pat Lass
|
|
|
WE NEED TO SCHEDULE A TIME TO GAIN ACCESS TO THE FACILITY PLEASE CALL MIKE AT ###-#### ON MONDAY MORNING TO CONFIRM MEETING TIME. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen bond electrodes together and main bonding jumper in generator
|
ELE-Aging Inspection | 4/14/2009 | 4/14/2009 | 4/16/2009 | | NR |
Pat Lass
|
|
|
suc
|
Electrical Rough-In | 12/16/2008 | 12/16/2008 | 12/16/2008 | P | PART |
Pat Lass
|
|
|
The actual location of the pump house is on Cartwright road North of the church located at Bogus Basin and Cartwright. The pump house will be on the East just before a fire station. Field contact Jeff ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen u/G ok
|