Final | 4/2/2009 | 4/2/2009 | 4/2/2009 | P | PASS |
Bob Reichert
|
|
|
dale//please call 1/2 hr prior to meet you Phone #: ###-#### ok to final, signed structural card, could not add esc response
|
Electrical Rough-In | 3/20/2009 | 3/20/2009 | 3/20/2009 | P | PASS |
Bob Reichert
|
|
|
Ceiling inspection please-jim Phone #: ###-#### ok to cover ceiling only
|
Electrical Rough-In | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | PASS |
Mike Kinnear
|
|
|
Jim Phone #: ###-#### ok cover walls only note no esc permit in project
|
Electrical Rough-In | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | PART |
Jack Frank
|
|
|
conrete in slab pour inspection please--jim Phone #: ###-#### u/g for x-ray equip. ok
|
Conference | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | DONE |
Jack Frank
|
|
|
conrete in slab pour inspection please--jim Phone #: ###-#### had conference with contr on GEC for x-former, x-ray equip., and NEC Art. 517
|