ELE-Aging Inspection | 7/14/2010 | 7/14/2010 | 7/14/2010 | | CANC |
Jack Frank
|
|
|
|
DOC - Permit Expired | 7/14/2010 | 7/14/2010 | 7/14/2010 | A | PASS |
Jack Frank
|
|
|
|
ELE-Aging Inspection | 5/14/2010 | 5/14/2010 | 5/20/2010 | | CANC |
Jack Frank
|
|
|
|
ELE-Aging Inspection | 9/1/2009 | 9/1/2009 | 9/8/2009 | | PART |
Jack Frank
|
|
|
called left message
|
ELE-Aging Inspection | 4/8/2009 | 4/8/2009 | 4/9/2009 | | PART |
Jack Frank
|
|
|
called left message
|
Electrical Rough-In | 2/5/2009 | 2/6/2009 | 2/6/2009 | A | FAIL |
Jack Frank
|
|
|
sub panel ###-#### called corr posted BCC 4-05-32 no violations to br retained #1, 240.15 & 240.83(E) shall use factory handle ties, if breakers are approved for dual voltage, if not replace them #2, 200.6&7 shall not use white wire as phase conductor #3, 310.15 T shall derate conductors where required by code noted #4, 110.26(F)(2) shall remove phone equipment from below new subpanel
|
Electrical Rough-In | 2/5/2009 | 2/6/2009 | 2/5/2009 | P | PART |
Jack Frank
|
|
|
ready for inspection Phone #: ###-#### Internet Inspection Request from: gary batten have ? on use of breakers for 3 phase, and white wire used as phase
|