Final | 2/8/2010 | 2/8/2010 | 2/8/2010 | P | PASS |
Bob Reichert
|
|
|
Mike Phone #: ###-#### corrections made, ok to final, no esc this project
|
Final | 2/5/2010 | 2/5/2010 | 2/5/2010 | P | FAIL |
Bob Reichert
|
|
|
Mike Phone #: ###-#### please call 30 min before going out left correction notice, NEC 110.26(A) shall provide workspace about panel per article, 410.16(C) closet lights shall be provided with clearance per article, NOTE corrections shall be made within 5 working days or further action will be taken
|
ELE-Aging Inspection | 2/4/2010 | 2/5/2010 | 2/4/2010 | A | CANC |
Doug A Poedy
|
|
|
|
Conference | 3/6/2009 | 3/6/2009 | 3/6/2009 | A | DONE |
Bob Reichert
|
|
|
met contractor, talked about sub-panel clearance isuues and that he needs to provide adequate clearance per NEC, no esc this project
|
Conference | 3/6/2009 | 3/9/2009 | 3/6/2009 | A | CANC |
Bob Reichert
|
|
|
Mike Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
Electrical Rough-In | 3/3/2009 | 3/3/2009 | 3/3/2009 | P | PART |
Pat Lass
|
|
|
mike Phone #: ###-#### underground kitchen and bath ok to cover
|