Final | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Bob Reichert
|
|
|
Kevin-Please call at least 30 mins prior to inspection Phone #: ###-#### ok to final
|
Permanent Service | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PASS |
Mike Kinnear
|
|
|
don Phone #: ###-#### p/s u/g reconnect ok
|
Electrical Rough-In | 2/20/2009 | 2/23/2009 | 2/23/2009 | A | PASS |
Jack Frank
|
|
|
terry Phone #: ###-#### r/i ok
|
Electrical Rough-In | 2/20/2009 | 2/20/2009 | 2/20/2009 | P | FAIL |
Bob Reichert
|
|
|
terry Phone #: ###-#### called contractor, left correction notice, NEC 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing member, 334.30 nm cable shall be secured within 12" of box, BCC no violations shall be retained- nm cable within 1 1/4" of framing member
|