Final | 3/17/2009 | 3/18/2009 | 3/18/2009 | A | PASS |
Bob Reichert
|
|
|
John Phone #: ###-#### met contractor, ok to final, signed occupancy card
|
Permanent Service | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | PASS |
Bob Reichert
|
|
|
john Phone #: ###-#### p/s u/g rec ok
|
Electrical Rough-In | 3/13/2009 | 3/13/2009 | 3/13/2009 | P | PASS |
Jack Frank
|
|
|
John- ceilings ok anop
|
Conference | 3/13/2009 | 3/13/2009 | 3/13/2009 | P | DONE |
Jack Frank
|
|
|
John- ceiling cover Phone #: ###-#### conference on grding p/s and seperately derived system
|
Electrical Rough-In | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | PASS |
Bob Reichert
|
|
|
John Phone #: ###-#### walls and hard lids only ok to cover
|
Conference | 2/27/2009 | 3/2/2009 | 3/2/2009 | A | DONE |
Bob Reichert
|
|
|
John Phone #: ###-#### reviewed service for ti and addendum contractor didn"t understand in order to bring service up to code
|