Final | 5/19/2009 | 5/20/2009 | 5/20/2009 | A | PASS |
Jack Frank
|
|
|
cal Phone #: ###-#### ok
|
Final | 5/19/2009 | 5/19/2009 | 5/19/2009 | P | CANC |
Jack Frank
|
|
|
Cal Phone #: ###-####
|
Final | 5/18/2009 | 5/18/2009 | 5/18/2009 | P | FAIL |
Jack Frank
|
|
|
Cal- call for access Phone #: ###-#### called no access people moved stuff in house need someone there
|
Permanent Service | 3/25/2009 | 3/25/2009 | 3/25/2009 | P | PASS |
Bob Reichert
|
|
|
cal Phone #: ###-#### p/s o/h rec ok, no esc this project
|
Electrical Rough-In | 3/2/2009 | 3/3/2009 | 3/3/2009 | A | PASS |
Bob Reichert
|
|
|
Cal Phone #: ###-#### called, talked about service later, reminded contractor to supply range and dryer with 4-wire circuits, ric ok, no esc this project
|