Final | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Bob Reichert
|
|
|
Ron Phone #: ###-#### called contractor, no card to sign, ok to final
|
Final | 6/22/2009 | 6/23/2009 | 6/23/2009 | P | PART |
Bob Reichert
|
|
|
ron Phone #: ###-#### looked at roof-top unit, building locked, called contractor, will call when accesible, can sign card when available
|
Final | 6/5/2009 | 6/8/2009 | 6/8/2009 | A | CANC |
Bob Reichert
|
|
|
ron Phone #: ###-#### met contractor, no way for roof access,still working on core and shell, told to call when safe for public and construction more done
|
Final | 4/28/2009 | 4/28/2009 | 4/28/2009 | P | CANC |
Mike Kinnear
|
|
|
ron//PLEASE CALL Phone #: ###-#### wrong type inspection
|
Electrical Rough-In | 4/28/2009 | 4/28/2009 | 4/28/2009 | P | PASS |
Mike Kinnear
|
|
|
ron//PLEASE CALL Phone #: ###-#### ok cover under ground conduit for light poles
|
Rough-In Permanent Service | 4/14/2009 | 4/15/2009 | 4/15/2009 | A | PASS |
Mike Kinnear
|
|
|
Ron Phone #: ###-#### ok cover under slab conduit p/s u/g n ok note house panel only
|
Electrical Rough-In | 4/8/2009 | 4/8/2009 | 4/8/2009 | P | PART |
Mike Kinnear
|
|
|
Ron Phone #: ###-#### ok cover under ground conduit for parking lot lights
|
Electrical Rough-In | 3/17/2009 | 3/17/2009 | 3/17/2009 | P | PART |
Bob Reichert
|
|
|
Ron Phone #: ###-#### ok cover underground conduit for core and shell only ok to cover includes area for electrical room, center area, north and south stub outs
|
Electrical Rough-In | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | PART |
Mike Kinnear
|
|
|
Alan Phone #: ###-#### ok cover under conduit stub outs 1inch only
|
Electrical Rough-In | 3/4/2009 | 3/5/2009 | 3/5/2009 | A | PART |
Mike Kinnear
|
|
|
Ron-underground conduit for parking lot in back Phone #: ###-#### ok cover under ground conduit along the back west side only
|