Final | 5/14/2009 | 5/15/2009 | 5/15/2009 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/14/2009 at 3:51:56 PM. Contact: ###-####. called contractor, ok to final, no esc this project
|
Electrical Rough-In | 3/11/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/11/2009 at 7:21:46 AM. Contact: ###-####. called contractor, ric ok, no esc this project
|