Final | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Bob Reichert
|
|
|
Ron Phone #: ###-#### called contractor, no card to sign, ok to final
|
Final | 6/22/2009 | 6/23/2009 | 6/23/2009 | P | CANC |
Bob Reichert
|
|
|
ron Phone #: ###-#### called, no access, contractor will set up inspection when card available, after sign core and shall card, no esc this project
|
Final | 6/5/2009 | 6/8/2009 | 6/8/2009 | A | CANC |
Bob Reichert
|
|
|
ron Phone #: ###-#### see comments for core and shell, too much construction going on to final core and shell, so can't final this ti permit, no esc this project
|
Final | 5/26/2009 | 5/26/2009 | 5/26/2009 | P | PART |
Bob Reichert
|
|
|
Ron Phone #: ###-#### signed t/o card, need to final core and shell before final, rest ok, no esc this project
|
Electrical Rough-In | 5/6/2009 | 5/7/2009 | 5/7/2009 | A | PASS |
Bob Reichert
|
|
|
Ron Phone #: ###-#### ceiling only ok to cover, no esc this project
|
Electrical Rough-In | 5/6/2009 | 5/6/2009 | 5/6/2009 | P | FAIL |
Mike Kinnear
|
|
|
Ron- above the ceiling grid Phone #: ###-#### nec210.62 show window outlets needed. note no esc permit in project
|
Permanent Service | 4/28/2009 | 4/28/2009 | 4/28/2009 | P | PASS |
Mike Kinnear
|
|
|
ron Phone #: ###-#### p/s u/g n ok note needs meter only
|
Electrical Rough-In | 4/10/2009 | 4/13/2009 | 4/13/2009 | P | PART |
Pat Lass
|
|
|
Ron ###-####//request early pm walls ok
|