Final | 5/6/2009 | 5/6/2009 | 5/6/2009 | P | PASS |
Bob Reichert
|
|
|
This will be for re-inspection of the final.Please contact Ron before the inspection ###-####.He will meet you at the job site.Thanks. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw corrections made, met contractor, ok to final, signed occupancy card, no esc this project
|
Final | 5/4/2009 | 5/4/2009 | 5/4/2009 | P | NR |
Bob Reichert
|
|
|
This will be for a final inspection.contact will be Ron ###-####.Thanks and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw called contractor, shall add ceiling wires for fixtures,strap mc cable, support box, shall not allow low voltage wires or mc to be on tiles or grid, fee due, no esc this project
|
Electrical Rough-In | 4/21/2009 | 4/21/2009 | 4/21/2009 | A | PART |
Bob Reichert
|
|
|
This inspection will be a partial rough-in on walls at teller line.Contact will be Justin or Dan.Thanks and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw called contractor, wall by teller station only ok to cover, no esc this project
|