Final | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PASS |
Bob Reichert
|
|
|
Mark ###-####//please call 30 min prior ok to final, no esc this project
|
Electrical Rough-In | 5/4/2009 | 5/5/2009 | 5/5/2009 | A | PASS |
Bob Reichert
|
|
|
mark - please call 1/2 hr prior Phone #: ###-#### told owner to use cut-in boxes or listed boxes rather than standard boxes with screws inside, ric ok, no esc this project
|
Conference | 4/27/2009 | 4/27/2009 | 4/27/2009 | P | DONE |
Mike Kinnear
|
|
|
Mark Phone #: ###-#### did conf over phone saw lower part which looked ok . advised him wall spacing & free lenght of conductor for upstairs.
|