Final | 5/12/2009 | 5/12/2009 | 5/12/2009 | P | PASS |
Jack Frank
|
|
|
Please contact Bryan Atkins at ###-#### prior to inspection so that he can meet you onsite. Phone #: ###-#### Internet Inspection Request from: Bryan Atkins
|
Electrical Rough-In | 5/12/2009 | 5/12/2009 | 5/12/2009 | P | PASS |
Jack Frank
|
|
|
Please contact Bryan Atkins at ###-#### prior to inspection so that he can meet you onsite. Phone #: ###-#### Internet Inspection Request from: Bryan Atkins needs to check for metallic raceways in plastic boxes
|