Final | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | PASS |
Bob Reichert
|
|
|
This will be a final please. Contact is Rey. Thank you and have a super weekend. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok to final, 412 and 370 did inspection, no esc this project
|
Electrical Rough-In | 8/21/2009 | 8/24/2009 | 8/24/2009 | A | PASS |
Bob Reichert
|
|
|
This inspection will be for an overhead ceiling inspection. Would like an early inspection if possible please. Contact is Rey. Thank you have a wonderful day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw met 412, with 370 looked at ceilings lumper area, ok to cover ceilings only, looked at pull boxes for cabling, told they need to re-pull #6 conductors with correct colors, no esc this project
|
Electrical Rough-In | 7/1/2009 | 7/1/2009 | 7/1/2009 | P | PASS |
Mike Kinnear
|
|
|
This inspection will be for rough in wall. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover walls only
|