Final | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Doug A Poedy
|
|
|
Rex Phone #: ###-####. Ok final.
|
DOC - Permit Finaled | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 9/23/2009 | 9/24/2009 | 9/24/2009 | P | PASS |
Doug A Poedy
|
|
|
Rex ###-####. Ok to cover.
|
Electrical Rough-In | 7/30/2009 | 7/31/2009 | 7/31/2009 | A | PASS |
Doug A Poedy
|
|
|
Scheduled by a contractor via Hello! on 7/30/2009 at 2:31:18 PM. Contact: ###-####. Ok to cover.
|
Electrical Rough-In | 6/11/2009 | 6/12/2009 | 6/12/2009 | P | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/11/2009 at 8:42:45 PM. Contact: ###-####. wrong thpe request, see p/s
|
Permanent Service | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/11/2009 at 8:42:45 PM. Contact: ###-####. met contractor, told to cut out top rail of trellis in front of panel and to put concrete encased electrode connection inside of structure, p/s o/h rec ok
|