Final | 8/24/2009 | 8/25/2009 | 8/25/2009 | A | PASS |
Bob Reichert
|
|
|
Dave Jackson Phone #: ###-#### called contractor, ok to final, no esc this project
|
Final | 8/21/2009 | 8/24/2009 | 8/24/2009 | A | CANC |
Bob Reichert
|
|
|
Dave ###-#### called contractor to reschedule, floors were done over week-end , could not do inspection because of fumes, no esc this project
|
Electrical Rough-In | 7/15/2009 | 7/15/2009 | 7/15/2009 | P | PASS |
Bob Reichert
|
|
|
Dave Phone #: ###-#### met contractor, ric ok, no esc this project
|
Permanent Service | 7/15/2009 | 7/15/2009 | 7/15/2009 | P | PASS |
Bob Reichert
|
|
|
p/s o/h rec ok, see 2 ground rods at final, no esc this project
|