Final | 5/25/2010 | 5/25/2010 | 5/25/2010 | A | PASS |
Bob Reichert
|
|
|
ok to final
|
Permanent Service | 5/24/2010 | 5/25/2010 | 5/25/2010 | A | CANC |
Bob Reichert
|
|
|
mike Phone #: ###-#### wrong type request, see final
|
Electrical Rough-In | 12/10/2009 | 12/10/2009 | 12/10/2009 | P | PASS |
Bob Reichert
|
|
|
Mike-garage code 2009 upstairs master floor heat inspection please Phone #: ###-#### ok to cover floor heat only in master bath, no esc this project
|
Electrical Rough-In | 7/10/2009 | 7/13/2009 | 7/13/2009 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/10/2009 at 3:29:37 PM. Contact: ###-####. ric ok, no esc this project
|