Final | 8/25/2009 | 8/26/2009 | 8/26/2009 | A | PASS |
Doug A Poedy
|
|
|
Scheduled by a contractor via Hello! on 8/25/2009 at 3:30:30 PM. Contact: ###-####. Ok final.
|
Electrical Rough-In | 7/8/2009 | 7/8/2009 | 7/8/2009 | P | PASS |
Doug A Poedy
|
|
|
Jim Phone #: ###-####. Called Jim with a verbal survey. Needed one more receptacle in downstairs hallway, and more nail plates.
|