Final | 10/27/2009 | 10/27/2009 | 10/27/2009 | P | PASS |
Doug A Poedy
|
|
|
jack - please call prior 1/2 hr prior so he can meet you there Phone #: ###-####. Ok final.
|
Electrical Rough-In | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PASS |
Doug A Poedy
|
|
|
Jack please call first Phone #: ###-####. Ok to cover.
|
Permanent Service | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PASS |
Doug A Poedy
|
|
|
Jack please call first Phone #: ###-####. P/S U/G Reconnect ok.
|
Conference | 8/17/2009 | 8/17/2009 | 8/17/2009 | P | DONE |
Bob Reichert
|
|
|
jack Phone #: ###-#### met contractor, talked about wiring behind foam insulation, open walls and bringing existing walls up to code, said that if no walls are worked on, then don't have to add receptacles, but suggested it would be better to do, and that bedroom still required afci protection anyway
|
Electrical Rough-In | 8/11/2009 | 8/11/2009 | 8/11/2009 | P | PART |
Doug A Poedy
|
|
|
Jack-cover half of conduit Phone #: ###-####. Ok to cover underground conduit.
|