Final | 9/3/2009 | 9/3/2009 | 9/3/2009 | P | PASS |
Doug A Poedy
|
|
|
final for apts # 120,121,122,123 only. Phone #: ###-#### Internet Inspection Request from: Lee Braithwait. Ok final.
|
Rough-In Permanent Service | 8/26/2009 | 8/27/2009 | 8/27/2009 | P | PASS |
Doug A Poedy
|
|
|
Contact will be Kevin. ###-#### Phone #: ###-#### Internet Inspection Request from: Lee Braithwait. P/S U/G reconnect ok.
|
Electrical Rough-In | 8/6/2009 | 8/7/2009 | 8/7/2009 | P | NR |
Doug A Poedy
|
|
|
inspecting 4 units. 120,121,122,123. Please call ahead. I have to drive from Eagle to open up units. Kevin @ ###-#### Phone #: ###-#### Internet Inspection Request from: Lee Braithwait. Not quite ready. Turned into conference.
|
Conference | 7/15/2009 | 7/16/2009 | 7/16/2009 | A | DONE |
Doug A Poedy
|
|
|
Lee Phone #: ###-####. Talked about panels in kitchens and windows near outside meter packs.
|