Final | 7/30/2009 | 7/30/2009 | 7/30/2009 | P | PASS |
Bob Reichert
|
|
|
nick Phone #: ###-#### corrections made, ok to final, no esc this project
|
Final | 7/22/2009 | 7/23/2009 | 7/23/2009 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Robert Jangula called contractor, told that ri required before cover, requires appointment to meet electrician to do 2 permits for inspection, fee due, will cancel inspection for other inspection request, NEC violations: 300.11(B)(1) raceways shall only be used as means of support for cable if identified for the purpose, 110.12(B) panel shall not be damaged and shall readily be able to open, 300.14 at least 6" of free conductor shall be provided where it emerges from raceway, BCC shall supply fire caulking where penetrate fire wall, shall not cover before inspection, NOTE: this is partial only- need to see rest of work
|