Electrical Rough-In | 8/6/2009 | 8/7/2009 | 8/7/2009 | A | CANC |
Jack Frank
|
|
|
Jose Phone #: ###-####
|
Final | 8/7/2009 | 8/7/2009 | 8/7/2009 | A | PASS |
Jack Frank
|
|
|
Jose Phone #: ###-####
|
Electrical Rough-In | 8/3/2009 | 8/4/2009 | 8/4/2009 | A | FAIL |
Jack Frank
|
|
|
jose Phone #: ###-#### called corr bonding shall be done with solid not stranded wire250.32(B) isolate grds and neutrals , 110.3(B) manufacture states use #6 copper
|
Final | 7/31/2009 | 8/3/2009 | 8/3/2009 | P | NR |
Doug A Poedy
|
|
|
jose Phone #: ###-####. Didn't pass rough in.
|
Electrical Rough-In | 8/3/2009 | 8/3/2009 | 8/3/2009 | P | FAIL |
Doug A Poedy
|
|
|
jose Phone #: ###-####. NEC 300.5 Underground Installations. NEC 680.26(B)7 Bonding.
|