Final | 10/19/2009 | 10/20/2009 | 10/20/2009 | A | PASS |
Bob Reichert
|
|
|
Jim is the onsite contact his no is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ok to final, no esc this project
|
Electrical Rough-In | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | PASS |
Doug A Poedy
|
|
|
Jim is the contact his no. is ###-####. Thank you. Phone #: ###-#### Internet Inspection Request from: Shawna Gates. Ok to cover.
|
Permanent Service | 8/7/2009 | 8/10/2009 | 8/10/2009 | A | PASS |
Doug A Poedy
|
|
|
Please call Jim 30 min prior to inspection at ###-####. Thank you. Phone #: ###-#### Internet Inspection Request from: Shawna Gates. P/S O/H connect ok.
|