Final | 10/1/2009 | 10/1/2009 | 10/1/2009 | P | PASS |
Doug A Poedy
|
|
|
Mike Phone #: ###-####. Ok final.
|
DOC - Permit Finaled | 10/1/2009 | 10/1/2009 | 10/1/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 8/17/2009 | 8/17/2009 | 8/17/2009 | P | PASS |
Doug A Poedy
|
|
|
Mike-back door code1369 Phone #: ###-####. Ok to cover.
|
Rough-In Permanent Service | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | CANC |
Doug A Poedy
|
|
|
mike Phone #: ###-####. Seperated rough in and perm service.
|
Electrical Rough-In | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | FAIL |
Doug A Poedy
|
|
|
mike Phone #: ###-####. NEC 300.4 A1 Protection from physical damage. Needs more nail plating. Needs to have framing around wire running down beam.
|
Permanent Service | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Doug A Poedy
|
|
|
mike Phone #: ###-####. P/S O/H connect ok.
|