Final | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PASS |
Bob Reichert
|
|
|
alan Phone #: ###-#### called contractor, ok to final
|
Electrical Rough-In | 8/25/2009 | 8/27/2009 | 8/27/2009 | A | PASS |
Bob Reichert
|
|
|
Allen--Please call at least 30 mins prior to inspection--Inspection is for pool pipes Phone #: ###-#### corrections made, ok to cover u/g only
|
Electrical Rough-In | 8/24/2009 | 8/25/2009 | 8/25/2009 | A | FAIL |
Bob Reichert
|
|
|
Allen--conduit for pool Phone #: ###-#### called, left correction notice, NEC 300.5 minimum burial depth shall be 18" except under 4" concrete, 352.36 there shall not more than 360 degrees total bends in raceway, shall use schedule 80 where subject to physical damage
|
Electrical Rough-In | 8/24/2009 | 8/24/2009 | 8/24/2009 | P | FAIL |
Bob Reichert
|
|
|
Alan Phone #: ###-#### called, left correction notice, BCC all u/g shall be inspected before cover, fee due
|
Electrical Rough-In | 8/10/2009 | 8/10/2009 | 8/10/2009 | P | PART |
Doug A Poedy
|
|
|
Alan Phone #: ###-####. Ok to cover pool bonding.
|