Final | 10/21/2009 | 10/21/2009 | 10/21/2009 | P | PASS |
Doug A Poedy
|
|
|
Ayn Phone #: ###-####
|
DOC - Permit Finaled | 10/21/2009 | 10/21/2009 | 10/21/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 9/14/2009 | 9/14/2009 | 9/14/2009 | P | PASS |
Jack Frank
|
|
|
Ayn //early as possible Phone #: ###-#### ok
|
Electrical Rough-In | 9/11/2009 | 9/11/2009 | 9/11/2009 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/11/2009 at 6:51:10 AM. Contact: ###-####. called corr. not made
|
Electrical Rough-In | 9/8/2009 | 9/9/2009 | 9/9/2009 | A | FAIL |
Bob Reichert
|
|
|
Anayn ###-#### called, left message, left correction notice, NEC 300.14 shall provide 6" free conductor length at boxes, 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing members, 110.12(B) electrical equipment and surfaces shall not be contaminated by foreign material, 250.148(C) shall use ground screws in metal boxes, 210.52(A)(2) shall provide receptacles in 2' walls, 334.30 nm cable shall be secured within 12" of panel and boxes, no esc this project
|