Final | 11/23/2009 | 11/24/2009 | 11/24/2009 | A | PASS |
Doug A Poedy
|
|
|
Please contact John our Wireman on-site and he will meet you at the front desk and take you to the 3RD Floor. Phone #: ###-#### Internet Inspection Request from: Clint Tate. Unable to see everything. Ceiling was put in.
|
Electrical Rough-In | 11/24/2009 | 11/24/2009 | 11/24/2009 | P | PASS |
Doug A Poedy
|
|
|
Please contact John our Wireman on-site and he will meet you at the front desk and take you to the 3RD Floor. Phone #: ###-#### Internet Inspection Request from: Clint Tate
|