Final | 10/12/2009 | 10/13/2009 | 10/13/2009 | A | PASS |
Doug A Poedy
|
|
|
Final complete.
|
DOC - Permit Finaled | 10/13/2009 | 10/13/2009 | 10/13/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Final | 9/28/2009 | 9/28/2009 | 9/28/2009 | P | PART |
Doug A Poedy
|
|
|
This is a partial final electrical inspection just for suite B (this is the only room that has the lights installed). The contact on the job is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery. Ok partial final.
|
Electrical Rough-In | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | PASS |
Doug A Poedy
|
|
|
Re-inspect of electrical rough-in. Contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery. ok to cover.
|
Electrical Rough-In | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | FAIL |
Doug A Poedy
|
|
|
Electrical rough inspection in basement of the Garro Building, tenant spaces B-B, B-D & B-E. Contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery. NEC 110.3 B Installations to manufatures specs. NEC 3004.4 D Nailplates.
|