Final | 10/16/2009 | 10/16/2009 | 10/16/2009 | P | PASS |
Bob Reichert
|
|
|
reinspect for added rooms and garage service // Brandon ###-#### corrections made, ok to final
|
Final | 10/13/2009 | 10/16/2009 | 10/16/2009 | P | PART |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Brandon Blackham called contractor, will check later for fixtures and intersystem bonding bar
|
Electrical Rough-In | 9/22/2009 | 9/22/2009 | 9/22/2009 | P | PASS |
Bob Reichert
|
|
|
trench is open for underground to garage Phone #: ###-#### Internet Inspection Request from: Brandon Blackham called contractor, ok to cover u/g house to garage
|
Electrical Rough-In | 9/20/2009 | 9/21/2009 | 9/21/2009 | P | CANC |
Bob Reichert
|
|
|
underground to garage Phone #: ###-#### Internet Inspection Request from: Brandon Blackham contractor called, equipment broke down, will recall
|
Rough-In Permanent Service | 9/17/2009 | 9/17/2009 | 9/18/2009 | A | PASS |
Bob Reichert
|
|
|
Around 10 if you can. Phone #: ###-#### Internet Inspection Request from: Brandon Blackham ric ok, p/s u/g n ok, NOTE: met contractor, told to call for u/g inspection fron house to garage and to post addresses, told to change room count and add service
|