Final | 4/6/2010 | 4/6/2010 | 4/6/2010 | P | PASS |
Doug A Poedy
|
|
|
Call Paul. Inspection requested from web by: Sean DeLacy Phone #: ###-####
|
DOC - Permit Finaled | 4/6/2010 | 4/6/2010 | 4/6/2010 | P | PASS |
Doug A Poedy
|
|
|
|
Final | 3/29/2010 | 3/29/2010 | 3/29/2010 | P | FAIL |
Doug A Poedy
|
|
|
PAUL PLEASE CALL PRIOR TO HEADING TO SITE Inspection requested from web by: Sean DeLacy Phone #: ###-####. NEC 210.4 Breaker ties. Needs receptacle for hot tub.
|
Electrical Rough-In | 10/1/2009 | 10/2/2009 | 10/2/2009 | A | PASS |
Doug A Poedy
|
|
|
paul Phone #: ###-####. Ok to cover. Building permit pulled.
|
Electrical Rough-In | 9/28/2009 | 9/28/2009 | 9/28/2009 | P | NR |
Jack Frank
|
|
|
Paul Phone #: ###-#### r/i ok but can't approve until general secures bld permit if ? call jack frank
|
Permanent Service | 9/16/2009 | 9/17/2009 | 9/17/2009 | P | PASS |
Doug A Poedy
|
|
|
PAUL EARLY PM Phone #: ###-#### Internet Inspection Request from: Sean DeLacy. P/S O/H Reconnect ok.
|
Conference | 9/16/2009 | 9/16/2009 | 9/16/2009 | P | DONE |
Jack Frank
|
|
|
Paul-regarding knob & tube Phone #: ###-#### called answered contr questions
|