Final | 10/9/2009 | 10/9/2009 | 10/9/2009 | P | PASS |
Doug A Poedy
|
|
|
bill Phone #: ###-####. Ok final.
|
DOC - Permit Finaled | 10/9/2009 | 10/9/2009 | 10/9/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 10/7/2009 | 10/7/2009 | 10/7/2009 | P | FAIL |
Doug A Poedy
|
|
|
Bill-ceiling grid inspection please Phone #: ###-####. NEC 314.23 J-boxes in ceiling need to be supported. NEC 330.30 MC cable shall be secured 12 inches from j-box and intervals not to exceed 6 ft. NEC 358.30 EMT shall be secured within 3 ft of j-box and not exceed 10 ft intervals.NEC 314.25 Each j-box shall have a cover. NEC 314.17 Openings shall be closed.
|