Permanent Service | 9/30/2009 | 10/1/2009 | 10/1/2009 | A | PASS |
Jack Frank
|
|
|
Warren Phone #: ###-#### p/s o/h rec. ok
|
Final | 10/1/2009 | 10/1/2009 | 10/1/2009 | A | PASS |
Jack Frank
|
|
|
Warren Phone #: ###-####
|
Permanent Service | 9/28/2009 | 9/29/2009 | 9/29/2009 | A | FAIL |
Jack Frank
|
|
|
warren - please call 1/2 hr prior so he can meet you there Phone #: ###-#### met contr, needs support for all 3 mast, conn. where cables enter cabinets, 260.52(A)(1) grd u/g water within 5ft of where it first enters, use sun res. wire in mast, all conductors of circuits shall be same size, 225.30 thru 225.36 needs p/s for out building see 250.32 for grding at out building note no romex in outside conduits, wire not suited for wet location , no violation retained address sub panel at garage also no cord for welder recept, if ? call me
|
Conference | 9/21/2009 | 9/21/2009 | 9/21/2009 | P | DONE |
Bob Reichert
|
|
|
POWER ELE Phone #: ###-#### talked about service change and clearance over roof, and slope of roof, electrician has to come back to figure what he wants to do, no esc this project
|